It Reduces Anxiety By Reducing The Expected Quality Of The Project
From The Best Of All Possible Efforts The The Best That Can Be Expected
Given The Limited Time.
It reduces anxiety by reducing the expected quality of the project
from the best of all possible efforts the the best that can be expected
given the limited time.